Don't have an account?
Experience clear and detailed visualization during a variety of spine procedures. OEC C-arms also bring efficiency to any operating suite through a variety of imaging options, including mobile cone beam CT.
Experience clear and detailed visualization during a variety of spine procedures. OEC C-arms also bring efficiency to any operating suite through a variety of imaging options, including mobile cone beam CT.
With OEC 3D, comprehensive imaging coverage of 19 cm x 19 cm x 19 cm 3D volumes and exceptional 2D images enables viewing several levels of the spine in the operating room.
The OEC 3D presents five perspectives: Axial, Coronal, Sagittal, MIP, and VR, on a 4K display for clear and detailed review of 3D volumes and 2D images
Analyze CT-like images with the OEC 3D Volume Viewer which includes Multi-Oblique, Area Measure, Window Level/Window Width, rotate, zoom, and more for quick and comprehensive visualization.
Enhance 2D imaging with Spine and C-Spine preset profiles. Digitally zoom up to 4X during a fluoro shot with no change in dose by using Live Zoom.
Review screws with automatic detection and numbering, manually label spine levels, and visualize spinal curvature alignment with Spine Suite, an optional application available with OEC 3D.
Complex spine procedures demand powerful imaging.
OEC premium C-arms excel in:
• Vertebral Body Tethering
• Anterior Cervical Discectomy and Fusion
• Spine Fracture Reduction
• Vertebroplasty
• Cervical Disc Replacement
• Lumbar Fusion
• Laminectomy
• Spinal Arthrodesis
*OEC Open is the OEC 3D C-arm interface designed to transfer 3D reconstructed volume data set to navigation or robotic systems.